Top 20 Interview Question for Fresher civil Engineers

Posted on September 18, 2023
Contents hide
1 If you have to estimate a Building, what type of data do you need?
2 Related posts:
3 Related
If you have to estimate a Building, what type of data do you need?

 · A project specification- Document which describe the quantity, type, nature, construction method and size of construction work 

 · Project drawings- Architectural Drawing Includes The buildings for 2-D and 3-D

 · Rates of materials-  Usually to know the The average construction cost of home depend on the material cost. that varies location wise.

What is the size of Fine aggregate?

(< 4,75 sieve, passing-ex-Sand )

Why Are Pull-out Tests Performed For Soil Nails?

Pull out tests are performed for primarily the following reasons:

In order to detect and the verification of the bond strength among the soil and the grout adopted during the design of soil nails. This is considered to be as the primary objective of performing pull out tests for soil nails.For the detection of any slippage or occurrence of creeps.To detect the elastic and deformations (plastic) of any of the test nails employed. Observations are made during the loading and unloading cycles of the soil nails repetitively.To achieve the perfect balance the test nails should always be loaded so that the ultimate soil/grout mixture with an upper limit of 80%.

what is the Size of Coarse Aggregate-

(> 4.74 mm sieve, Retain )

What do you mean by bulking?

(the volume increase of fine aggregate due to presence of Moisture Content in it)

Which cement is used for mainly building construction where strength required with age-

See also  Mass Timber in the United States
Powered by Inline Related Posts

(PPC)

Why Is Propping Required For Long Structures Once The Form Work Is Removed?

Once the process of concreting is performed the striking of the formworks should be done as soon as possible as delay in this process can lead to the discoloration of the concrete structures. In case of long structures particularly long span structures once the structures have attained enough strength to support themselves it is essential to provide them with propping as creep deflection can take place which can greatly reduce the integrity of the structure.

Due to the above mentioned reasons propping should be done after the removal of formwork. Also the props should not be made to stand long as it can lead to overstress for the structures.

Unit Weight of RCC

(25Kn/cum)

Thickness of DPC –

50mm

Water to be used in concrete must have a PH value of?

(6 to 8.5 )

What is BBS?-

bar bending schedule meaning way to organizing rebar’s for structural unit, giving detailed reinforcement requirement.

What is material statement?-

it’s a Table showing quantity of materials required for a particular work. For the Excavation, Brick work, R.C.C P.C.C and other

What is analysis of rates?

-it’s a process in which overall cost of any item of work is determined per unit quantity of work.

What do you mean by demising walls?

The demising wall is used for the border that separates your land from neighbour’s house.

The post Top 20 Interview Question for Fresher civil Engineers appeared first on Civil Site Visit.

See also  How to do SaaS SEO Keyword Research | Practical Guide
Powered by Inline Related Posts

Related posts:

Role and Importance of Construction Insurance for Contractors
Free Internship for civil engineers | AICTE Internship
Firehouse Ministries Shelter is Newest MBMA Folio
71 Interesting Quotes About Electrical Engineering
Civil Quality Control Engineer Interview Question
Western Washington University, Mortenson and Perkins&Will Celebrate Groundbreaking of the First ...
BREAKTHROUGH REPORT REDEFINES BUILT ENVIRONMENT PACKAGING 
Splendora ISD selects LAN as Program Manager for Bond Program

Related

©2023 Cher Slim | Design: Newspaperly WordPress Theme
Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}