Skip to content

Cher Slim

Free

Menu
  • Home
  • Institution
  • Media
  • Education
  • Movies
    • New Movies
    • Action Movies
    • chinese drama
    • Japanese Drama
    • Korean Drama
    • Netflix
  • Other
    • iDeas
    • People
  • Privacy Policy
Menu

STV Wins Key Project to Design Wastewater Treatment Plant Expansion in Central Texas 

Posted on September 19, 2023
Contents hide
1 Related posts:
2 Related

KYLE, TX – STV, a professional services firm that plans, designs and manages infrastructure projects across North America, today announced that it has signed a contract with the City of Kyle, Texas, to serve as lead design engineer for the second phase of the city’s Wastewater Treatment Plant (WWTP) expansion. STV’s work will double the plant’s current capacity from 4.5 million gallons per day (MGD) to 9 MGD and incorporate a new total phosphorus limit of 0.5 mg/L, which is currently being finalized as part of the plant’s permit amendment. The expansion will equip the city to meet the increasing infrastructure needs of its rapidly growing community.  

STV will provide a full suite of planning and design services for Kyle’s WWTP, including the development of a nutrient management strategy and the installation of vital equipment that will double the plant’s flow capacity while meeting strict water quality permit limits.  

Located approximately 20 miles south of Austin, Kyle is set to become the most populous city in Hays County within the next 10 years. Since 2000, the city’s population has grown more than 800%, from 5,000 residents to more than 50,000 in 2022, according to the city’s census data. When the city’s existing wastewater treatment plant was reaching capacity, Kyle embarked on a major expansion project in 2020 that increased average daily plant capacity from 3.0 MGD to 4.5 MGD. STV provided value engineering and TCEQ permit renewal support. In Phase 2, the firm will lead the necessary improvements to increase flows that can be treated and discharged to 9.0 MGD, doubling the plant’s capacity. 

See also  KAI Breaks Ground on St. Louis Community College’s New $62M Center for Nursing and Health Sciences
Powered by Inline Related Posts

“Kyle is a fast-growing city and this project’s swift completion is key to maintaining the city’s service to their community,” said Lindsay Webb, P.E., project manager at STV. “Through our longstanding relationship with the City of Kyle, STV’s local knowledge and technical expertise is addressing this region’s crucial needs for water and wastewater infrastructure, while helping the community anticipate additional infrastructure expansion needs to create the most efficient plant.” 

Since 2017, STV has provided the City of Kyle with design services for roadways and traffic signals, wastewater interceptors and lift station improvements, as well as survey services for the city. The plant expansion is the largest collaboration to-date between the city and STV. 

STV has extensive experience with water and wastewater infrastructure in Texas and across the U.S. In Austin, STV served as lead designer for the rehabilitation and improvement of the South Austin Regional Wastewater Treatment Plant, one of the city’s two major municipal treatment facilities. In Dallas, STV converted the Central Regional Wastewater System’s grit removal basins to higher-capacity vortex basins. In San Antonio, STV provided a full suite of design and construction management services for the Vista Ridge Regional Supply Project (VRRSP), the largest public-private partnership (P3) water project in North America at the time of its completion. As a result, VRRSP supplies 20 percent more water for the San Antonio region, providing water security and meeting the needs of the rapidly growing community.  

 

Related posts:

Abaqus for Structural Engineering 
Quality Over Quantity: Today’s Bridge & Tunnel Inspection 
The Ultimate Guide to SEO Website Migration: A Foolproof Checklist
BREAKTHROUGH REPORT REDEFINES BUILT ENVIRONMENT PACKAGING 
LAND & WATER COMPLETES FIRST EVER DREDGE OF BLENHEIM’S QUEEN POOL IN OVER 100 YEARS
Understanding the Differences: Google Display Network vs Search Network
Singhania Buildcon Recruitment 2023 | Latest civil Engineer job
Unlock the Secret: Organic SEO Strategies to Hit 200,000 Monthly Users!
See also  APTIM Selected by U.S. Department of Energy to Decommission Ion Beam Facility
Powered by Inline Related Posts

Related

©2023 Cher Slim | Design: Newspaperly WordPress Theme
Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}